Scheduling Solutions

The system approaches listed here were conceived and developed by Dimetis on customer requirements:

In the context of the system realization Dimetis accomplished the following tasks :
  • Development of the specification on the basis of the customer requirements
  • Elaboration of the realization concept
  • Software development
  • Installation and integration of the system at the customer
  • User Training
  • Start-up
Dispositionssysteme

The system approaches listed here were conceived and developed by Dimetis on customer requirements:

Bayerischer Rundfunk (BR Munich)

  • Transmission planning and Sceduling System SUSI

 

Download SUSI Case Study
 

Zweites Deutsches Fernsehen (ZDF Mainz)

  • Connections and Resources Scheduling System LEIKA

 

Download LEIKA Case Study 

 

Deutsche Telekom AG

  • System PLUBEL

Inventory update/planning of line/distances for the broadcast net

 

SRG SSR idée suisse (Zurich, Switzerland )

  • Order Management System EASY

Planning of connections and resources for the production area

 

Download EASY Case Study
© 2012 Dimetis